Structural Sewer Rehabilitation
Key Achievements
Key Achievements 359 property investigations completed across the South West40 confirmed misconnections identified and resolved224 suspected cases eliminated, preventing unnecessary worksNon-intrusive methods avoided excavation, significantly reducing cost and programme durationEstimated 70%+ reduction in carbon impact vs traditional investigation methodsZero disruption…
Key Achievements ~1 km estuary frontage fully mapped and verified100% asset visibility achieved across a previously uncertain networkSignificant reduction in repeat surveys and rework through “first-time-right” deliveryNon-intrusive methodology eliminated excavation, plant, and reinstatementEstimated 70%+ carbon reduction versus traditional investigation methodsZero…
Project Summary The Looe catchment programme reflects Glanville’s proven capability to identify and mitigate inflow and infiltration across complex wastewater networks. By combining advanced CCTV survey techniques, including tidal-led inspections and 360° manhole assessments, with a full suite of trenchless…
Project Summary South West Water’s £16m Infiltration Reduction Programme is the largest sewer rehabilitation scheme in its history, targeting the reduction of storm overflow across 175 high-risk sites. Delivered collaboratively with Glanville Environmental and Network Plus, the programme used advanced…